Cut Cooling Costs. Boost Reliability. Stay Green.
Kriora optimizes your data center cooling with AI. Fewer hotspots, lower kWh, healthier equipment — and ROI you can see from day one.
- ⚡ Up to 30% cooling energy reduction
- 🛡️ Predictive alerts & uptime
- 📈 ESG-ready reporting
Cooling is your #1 energy cost.
AI workloads generate 5–10× more heat and can push cooling to ~60% of facility energy. Hotspots risk equipment failure and downtime. Kriora stabilizes temperatures and cuts waste — without rewiring your plant.
Energy Breakdown
Cooling vs OtherFrom data to savings in 3 steps
Connect
Hook into BMS/SCADA, sensors, and cooling assets (CRAH/CRAC, chillers, pumps, liquid). No forklift upgrades.
Analyze
Kriora learns your site’s thermal behavior, predicts loads, and identifies optimal setpoints per zone and asset.
Optimize
Autonomous tuning reduces cooling energy while keeping temps in band. Continuous monitoring maintains performance.
AI-Optimized Cooling, Seamlessly Integrated.
Kriora learns your thermal profile, predicts load, and continuously tunes setpoints and airflow to minimize energy while protecting uptime.
- ⚙️ Autonomous Optimization — Real-time control of chillers, CRAH/CRAC, and pumps to cut kWh without violating temp limits.
- 🔮 Predictive Alerts — Early warnings for hotspots, sensor drift, filter clogging, and anomalous consumption.
- 🌡️ Thermal Stability — Tighter bands (±0.5 °C) at the rack level even as load shifts.
- 🔗 Works with Your Stack — BMS/SCADA integration; supports DX, chilled water, and liquid loops.
- 📊 Measurable ROI — Transparent before/after analytics, cost impact, and ESG exports.
Kriora Live Status
Cooling units • compact viewCRAC-1 Optimized
CRAC-2 Tuning
Chiller-1 High load
Pumps Nominal
Proven savings you can see.
Before/after results from production environments. Compare unit-level consumption with Kriora optimization applied.
Estimate your cooling savings
Enter your site’s IT load, PUE, and electricity price. Kriora projects cooling energy, annual cost, and the savings you can expect from optimization—typically 25–35% depending on configuration and controls.
Your Site
Enter kW or MW. Defaults reflect typical AI DCs.